Thursday, November 29, 2012

November 2012

November was a busy month. I had to get four quilts finished. I was so relieved and tired when I finished the last quilt. Since then I have been taking things kinda slow, I am keeping up with my BOW that Rhonda is hosting.

BOW

Block #7 is embroidered but I have not sewn the attic window on to it.

Birdies
March
April
May

I made the boys pillow cases. This had to be the easiest pattern for pillow cases.
Moda Turnover
I was looking for something one day and this Moda Turnover that I have had forever and remembered a tutorial I had saw using the turnovers, she used a charm pack and cut them in half. Well I had to make one. I need at least one more package of turnovers for the center of the quilt. This will be Chelsi's Christmas quilt next year. I think I've had the turnovers for two years so I hope I can find more.
Finishes
Nikolas

Chelsi's
If you look on the right side of the photo you can see the backing I used for this quilt.

Aiden's


Greg's
I like the back of Greg's quilt as well as I do the front.
I'm kinda at a crossroad about blogging and I'm not sure how or if I will continue. I do enjoy recording my doings.

I hope everyone had a wonderful Thanksgiving.

Saturday, November 17, 2012

Staying out of trouble

Well, at least I'm trying to stay of trouble. LOL I have Nikolas, Aiden and Chelsi's quilts finished and I'm working on Greg's. I'm sure Greg's quilt is growing. Whew!

At night I am doing hand embroidery. Every Tuesday I start on the BOW that Rhonda is doing. So fun!
Once I get my BOW done I'm working on Birdie Stitches.
January's block
February's block
I'm about half done with March. I'm thinking of doing the quilt as you go method when I quilt this quilt. Have any of you tried that method?

Wednesday, November 7, 2012

Train quilt

Remember this train fabric for Nikolas a quilt.

I was trying hard to keep it hid from Nikolas but he found it. I tried explaining to him about the blocks I was making to go with the fabric but the more I explained the more upset he got.
So I did the only thing I knew to do. I slapped some batting between the two pieces of fabric, quilted it and put a binding on.

I think Nikolas is going to love it!

Two more to quilt and I will be ready for Christmas morning.

Happy quilting!

Monday, November 5, 2012

Hand embroidery BOW #3

This the block for week 3 and it was perfect for my area. The wind has howled all week, but we had great temps.

I've been looking at fabric to make my attic window with but I can't quite decide. I still have time. I'm also thinking about doing this as a quilt as you go so I can try out the technique.

Happy quilting!

Friday, November 2, 2012

The next time......

......you see Chelsi's tea party it will be quilted and ready to place in her chubby little hands on Christmas morning. I ran into some bumps along the way but it all worked out. The quilt finished size is 46" x 60:. No I did not put a pink border on the top on purpose.
Happy quilting!

LinkWithin

Related Posts with Thumbnails